One-Stop Service Provider For Container Mobile Housing Projects And Smart Modular Buildings

Laos

Sep 28, 2025

Clean Energy Project in Southern Laos

Area: Laos

Room Type: Prefab House、Modular House            

Area: 5000m²or more

Scenes: Office Warehouse Time: 2025Year

Field: Engineering Camps

Cooperation Project Introduction: Building Container × Energy Enterprise Customized Packaged Containers​

1. Project Positioning: Modular Space Solution for Energy Scenarios​

This is a deep collaboration between the building container company and energy enterprises, centered on "scenario-specific customization & efficient delivery". It provides integrated modular packaged container solutions for energy projects (solar power plants, wind farms, oil-gas field work areas, energy storage stations, etc.) to meet needs of field operations, temporary offices and supporting services. It solves pain points of traditional civil engineering (long construction period, poor adaptability, difficult relocation) and supports energy projects in quick launch, safe operation and green advancement.​

2. Core Cooperation Value: Complementary Advantages​

•Mutual Strengths Integration: Energy enterprises provide scenario demands and safety standards (fireproof, explosion-proof, temperature resistance, sand-wind resistance) to define functional positions (e.g., PV operation stations, wind farm living areas). The building container company leverages modular technology to customize structures and supporting systems, realizing full-process adaptation from "demand-design-production-delivery".​

•Customized Scenario Solutions:​

◦Extreme environment adaptation: Adopts Class-A fire-resistant rock wool sandwich panels, explosion-proof electrical components, and thickened insulation layers (thermal conductivity ≤0.038W/(m·K)) for -30℃~60℃ use.​

◦Flexible module combination: Combines "office cabins + living cabins + storage cabins + lab cabins + supporting cabins (canteen/bathroom)".​

◦Energy self-sufficiency: Reserved PV panel installation interfaces on container tops, linking with distributed PV systems to reduce energy consumption.​

3. Key Highlights: Efficiency, Safety, Recyclability​

•Ultra-short Delivery: 90% factory prefabrication; 2,000㎡ packaged container clusters (including foundation work) can be completed in 30 days, shortening the construction period by 70% vs. traditional methods.​

•Safety Compliance: Meets national standards (e.g., Code for Construction Quality Acceptance of Steel Structures) and passes industry tests (explosion-proof certification for oil-gas fields, wind load tests for wind farms).​

•Movable & Reusable: Bolt-connected structure enables overall disassembly and relocation; reuse cost is 50% lower than new construction, fitting energy enterprises’ "project rolling development" needs.

 

Clean Energy Project in Southern Laos

Area: Laos

Room Type: Prefab House、Modular House            

Area: 5000m²or more

Field: Engineering Camps

Scenes: Office Warehouse Time: 2025Year

 

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Submit

Leave A Message

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Submit

Home

Products

whatsApp

contact